Three steps from PDF upload to compliance report.
Upload a road design PDF — feasibility study, final design report, traffic study, or geotechnical report. TARA accepts documents up to 300 pages across 11 engineering domains.
Design parameters are extracted from your document and checked against MoWT 2010, ERA 2013, AASHTO, and other published standards. Each finding includes clause references, submitted values, and required values.
Accept, edit, or reject each finding in the review interface. Add your own notes. Only confirmed findings are included in the final Word report, grouped by engineering domain with full clause references.
TARA checks designs against MoWT 2010, ERA 2013, AASHTO, and other published standards. Each finding shows the submitted value, required value, and the exact clause reference — no black-box results.
TARA provides the first-pass review. The engineer always decides. Accept findings as-is, edit with your own notes, or reject findings that don't apply. Only confirmed findings make it into the final report.
Once you've reviewed all findings, generate a structured compliance report. Only accepted and edited findings are included, grouped by engineering domain with full clause references.
Better compliance reviews. Faster turnaround. Every finding traceable to a published standard.
Start review